Barawa 25-year Water Master plan
master plan
years of planning
Barawa 25-year Water Master plan
The consultancy “BeledWayne 25-year Water Master Plans LRPS-2021-9165560” follows TS consolidated approach in water sources planning and development plans in the Somali peninsula.
The project is funded by UNICEF.
Niras).
- Remote sensing
- Geological-hydrogeological surveys
- Geotechnical surveys (VES, Refraction Seismic)
- Geophysical surveys
- Borehole drillings
- Topographical surveys
- Water demand Assessment
- Environmental Impact Assessment (EIA)
- Economic and Financial analysis
- Option paper on possible institutional arrangements to exploit the new assets
- Capacity-building needs assessment in support of Master Plan implementation
- Engineering executive designs of priority structures
- Design or 25-year Water Master Plan
- Tender package for supplies and for works
Terre Solidali has implemented 11 Water Master Plans in and over 50 ground water studies in Somalia so far.
During these years, TS has gained extensive experience on how to implement Master Plans, which have always been extremely useful for the development of the studied area.
Studies, research, surveys, data analysis and comparison make Master Plans a fundamental tool.
The Barawa 25-year Water Master plan focused on 3 main points in 5 phases:
- Inception – Phase 0-1
- Hydrogeological investigations and studies – Phase 2-3
- Scenario construction – Phase 4-5
1 - Inception – Phase 0-1
- Inception
- Socioeconomic analysis on the customer and willingness to pay
- Institutional and regulatory framework relevant to the Master Plan
- Governance modality or institutional arrangements to exploit the new assets that will be developed under the Master Plans
- Capacity building needs assessment
- Environmental impact assessment
- Infrastructure financial and economic analysis
2 - Hydrogeological investigations and studies – Phase 2-3
- Remote Sensing
- Geological investigations
- Hydrogeological research and water analysis
- Geophysical investigation
- Explanatory drilling
3 - Scenario construction – Phase 4-5
- Scenario comparison report
- Stakeholder consultation
- Engineering Designs
- Bill of Materials
- Lots and tender docs
- 25 year Master Plan
Pictures
Expertises
Equipment
Terre Solidali has the availability in Somalia of the following main equipment, instruments, machineries which can be used to carry out water studies:
Geophysical survey
Hydro-geological survey
Topographical survey
Geotechnical and Boreholes